English term or phrase:

1st Fix Installation

English answer:

first fix electrical work

Added to glossary by Jack Doughty
Apr 15, 2016 10:23
8 yrs ago
13 viewers *
English term

1st Fix Installation

English Tech/Engineering Construction / Civil Engineering electrical works
XYZ London require the 1st Fix electrical work to be undertaken by the nominated Electrical Contractor to XYZ London's specification.
Change log

Apr 29, 2016 05:44: Jack Doughty Created KOG entry

Responses

+4
6 mins
Selected

first fix electrical work

Build basics: electrics | Self-build.co.uk
www.self-build.co.uk/build-basics-electrics
First fix electrical work is all about preparation. At this stage, your contractor will put in the bare bones of your system – much of which will be hidden by the end ...
Peer comment(s):

agree Tony M
4 mins
Thank you.
agree Henk Sanderson
2 hrs
Thank you.
agree Veronika McLaren
2 hrs
Thank you.
agree Yasutomo Kanazawa
21 hrs
Thank you.
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "Selected automatically based on peer agreement."
+1
43 mins

installation before plastering: installing cabling and back boxes of sockets/switches

In electrical installation, "first fix" means the parts of the job that are done before plastering and "second fix" means the parts done after plastering. So first fix basically involves laying the cables (in conduits) in floors, walls and ceilings, and putting the "back boxes" of the sockets, switches and fittings in place (the inner part where the cables are connected). When this is done, the walls and ceilings are (re-)plastered and the floors laid or made good, and then the installation is completed in the "second fix", adding the fittings:

"If rewiring work is required, it should be undertaken at first fix stage (before plastering) [...]
As well as installing new cabling, first fix stage will involve fitting new back boxes for all sockets and switches. [...]
Once the first fix stage has been completed, the property can be re-plastered or the walls and ceilings filled and made good, and the flooring replaced. The second fix work can then proceed fitting sockets and switch plates, light fittings, the consumer unit and wiring any electric fans, cookers, extractor hoods, electric showers and the immersion heater, if there is a hot water storage cylinder."
https://www.homebuilding.co.uk/wiring-explained/
Peer comment(s):

agree B D Finch
5 hrs
Thanks!
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search